Breaking the weight barrier in deepwater cable installation

Installing submarine power cables at depths beyond 1,000 meters brings specific engineering challenges. Twaron® helps address these by reducing weight and installation strain while maintaining performance and reliability. 

Get the technical article to see how Twaron® reinforcement supports efficient deep water deployment. 

In this article, you’ll learn how Twaron®: 

  • Reduces installation strain, which is critical for deep water projects over 1,000 meters.
  • Lowers the overall weight of submarine power cables compared to traditional steel armoring.
  • Helped achieve a 47.5% weight reduction in a high-voltage interconnector project, improving installation efficiency. 