Technical article
Breaking the weight barrier in deepwater cable installation
Installing submarine power cables at depths beyond 1,000 meters brings specific engineering challenges. Twaron® helps address these by reducing weight and installation strain while maintaining performance and reliability.
Get the technical article to see how Twaron® reinforcement supports efficient deep water deployment.
In this article, you’ll learn how Twaron®:
- Reduces installation strain, which is critical for deep water projects over 1,000 meters.
- Lowers the overall weight of submarine power cables compared to traditional steel armoring.
- Helped achieve a 47.5% weight reduction in a high-voltage interconnector project, improving installation efficiency.
Complete the form to get a copy of the article.